Reconstruction of internal networks:
- Water supply (Ū1, T3; T4) – 2 787 m
- Firefighting water supply (Ū2) – 741 m
- Self-flowing sewerage (K1) – 2 183 m
- Technological sewerage (K3) – 246 m.
Reconstruction of external networks:
- Water supply (Ū1) – 467 m
- Sewerage (K1) – 638 m
- Sewer pressure line (SPK1) – 18 m
- Rainwater drainage (K2) – 1 613 m
- Water supply irrigation system (Ū2) – 959 m