Reconstruction of street:
- Construction area – 11 000 m2
- Asphalt concrete street pavement
- Paved sidewalks;
- Designed engineering communications:
Rainwater drainage
Sewerage
Power supply
Reconstruction of street:
Rainwater drainage
Sewerage
Power supply