Category

Design and Build

Year

2020

In July 2019, an agreement was signed with Ķekava Municipality “On the design and construction of a modular building at Ķekava Secondary School, Gaismas Street 9, Ķekava, Ķekava Parish, Ķekava Municipality”. In December 2019, construction work began. Along with the construction of a modular extension at Ķekava Secondary School, it is planned to provide study places for an additional 300 students. The area of ​​the extension is planned to be 1717 m2, it is planned on two floors, where a total of ten classrooms will be located. The Kekava Secondary School extension project has developed a new building facade solution and room layout by following under the modern requirements of educational institutions, solved the connection of the extension building with the existing secondary school building, landscaping, sidewalk construction in the territory, parking lots and bicycle parking. It is planned to use wooden finishing materials in the facade of the extension.

On November 11, 2020, the new school extension was solemnly opened!