Construction of a new electronics factory and warehouse in Mārupe with a total area of 767 m2. The building has two floors and one underground floor. Construction costs 735 150 EUR.
Engineering equipment:
- centralized power supply
- centralized gas supply
- centralized water supply
- central heating
- centralized sewerage
- centralized rainwater drainage
- fire safety system
- security alarm